Skip to main content
Průmysl, těžba a ropa a plyn · 2026-11-23

Poland Green Manufacturing Supply — Project Case

Fengguang Transformer delivered a tailored power package — six 2,500 kVA and four 1,600 kVA units — for a 28 MW green manufacturing supply project in Wrocław, Poland. Explore how our engineering team solved real-world challenges in green manufacturing supply.

Power quality at a 28 MW green manufacturing supply project in Wrocław came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with six 2,500 kVA and four 1,600 kVA units — selected and engineered for this specific green manufacturing supply.

The Site

On site, the facility connects to a modern but tightly regulated European grid, and the local temperate continental climate is a constant factor in equipment design. Poland’s Europe industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a European industrial manufacturer covered six 2,500 kVA and four 1,600 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Strict EU efficiency and environmental rules, plus a corporate goal to cut carbon, required best-in-class transformers with full documentation. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Meet EU ecodesign and efficiency tiers.
  • Full technical documentation and CE compliance.
  • Low noise near residential zones.
  • Recyclable, oil-safe design.

Our Solution

The specification centered on S22 Grade-1 and SC(B)18 dry-type transformers. Three decisions shaped the final design:

Electrical performance. Tier-1 loss performance and low-noise core construction — a direct response to the loads measured on site.

Site resilience. The units were built with eco-design compliant with biodegradable oil options, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 26 months without a fault, 99.97% supply availability, about 70 million kWh delivered annually and cut 42,000 t of CO₂ a year. For a European industrial manufacturer, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Wrocław’s grid and climate. It is one more example of how our team turns a green manufacturing supply brief into dependable power — and a reference we can build on across Poland.

FAQ

What was the key challenge in this Wrocław installation?

Strict EU efficiency and environmental rules, plus a corporate goal to cut carbon, required best-in-class transformers with full documentation. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S22 Grade-1 and SC(B)18 dry-type transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.