Fengguang Transformer delivered a tailored power package — eight 3,150 kVA dry-type units — for a 35 MW data centre and smart-building complex in Dubai, United Arab Emirates. Explore how our engineering team solved real-world challenges in data centre and smart-building power.
On site, the facility connects to Dubai’s high-reliability urban network, and the local hot desert climate with fully air-conditioned indoor spaces is a constant factor in equipment design. United Arab Emirates’s Middle East industrial growth has raised expectations for both capacity and continuity of supply.
Fengguang’s scope for a regional technology group covered eight 3,150 kVA dry-type units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.
The project needed best-in-class efficiency to lower cooling load, plus strict fire safety and seamless integration with building management systems. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.
The specification centered on SC(B)18 Grade-1 cast-resin dry-type transformers. Three decisions shaped the final design:
Electrical performance. Ultra-low no-load losses and precision temperature monitoring — a direct response to the loads measured on site.
Site resilience. The units were built with F1-class flame-retardant resin with digital temperature controllers, so performance holds up despite the local environment.
Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.
More than a year on, the numbers speak clearly: 28 months without a fault, 99.99% supply availability, about 290 GWh delivered annually and cut 165,000 t of CO₂ a year. For a regional technology group, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.
Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Dubai’s grid and climate. It is one more example of how our team turns a data centre and smart-building power brief into dependable power — and a reference we can build on across United Arab Emirates.
The project needed best-in-class efficiency to lower cooling load, plus strict fire safety and seamless integration with building management systems. We addressed it through targeted design choices rather than a standard catalog unit.
SC(B)18 Grade-1 cast-resin dry-type transformers, tailored to the site’s load profile and environment.