Fengguang Transformer delivered a tailored power package — twelve 1,000 kVA and eight 500 kVA units — for a 45 MW urban grid expansion programme in Lagos, Nigeria. Explore how our engineering team solved real-world challenges in urban grid expansion.

Power quality at a 45 MW urban grid expansion programme in Lagos came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with twelve 1,000 kVA and eight 500 kVA units — selected and engineered for this specific urban grid expansion.

The Site

On site, the facility connects to Lagos’s heavily loaded and unstable distribution network, and the local hot, humid tropical climate with frequent storms is a constant factor in equipment design. Nigeria’s Africa industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a state electricity distribution company covered twelve 1,000 kVA and eight 500 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

An aging network with frequent outages and overloads required rugged, easy-to-install transformers to expand capacity quickly across dense neighbourhoods. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Tolerate severe overloads and voltage fluctuations.
  • Fast installation across many scattered sites.
  • Low losses to cut utility costs.
  • Robust against storms and humidity.

Our Solution

The specification centered on S11 and S13 oil-immersed distribution transformers. Three decisions shaped the final design:

Electrical performance. Robust construction with strong overload capability — a direct response to the loads measured on site.

Site resilience. The units were built with sealed, moisture-resistant tanks suited to humid storm-prone areas, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 17 months without a fault, 99.6% supply availability, about 70 million kWh delivered annually and cut 38,000 t of CO₂ a year. For a state electricity distribution company, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Lagos’s grid and climate. It is one more example of how our team turns a urban grid expansion brief into dependable power — and a reference we can build on across Nigeria.

FAQ

What was the key challenge in this Lagos installation?

An aging network with frequent outages and overloads required rugged, easy-to-install transformers to expand capacity quickly across dense neighbourhoods. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S11 and S13 oil-immersed distribution transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.