Turkey Wind Farm Grid Integration — Project Case

Fengguang Transformer delivered a tailored power package — six 15 MVA step-up transformers — for a 90 MW wind farm grid integration project in İzmir, Turkey. Explore how our engineering team solved real-world challenges in wind farm grid integration.

Power quality at a 90 MW wind farm grid integration project in İzmir came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with six 15 MVA step-up transformers — selected and engineered for this specific wind farm grid integration.

The Site

On site, the facility connects to Aegean coastal grid with strong wind variability, and the local mediterranean climate with hot summers and coastal salt is a constant factor in equipment design. Turkey’s Europe industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a renewable-energy investor covered six 15 MVA step-up transformers, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Highly variable wind output and a coastal location demanded step-up transformers with excellent thermal cycling and corrosion resistance. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Handle rapid load and thermal cycling.
  • Resist coastal corrosion.
  • Meet grid-code fault-ride-through.
  • Low losses for energy yield.

Our Solution

The specification centered on SZ13 step-up transformers with OLTC. Three decisions shaped the final design:

Electrical performance. Optimized impedance and robust thermal design for wind — a direct response to the loads measured on site.

Site resilience. The units were built with marine-grade coatings and enhanced cooling, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 23 months without a fault, 99.9% supply availability, about 210 GWh delivered annually and cut 120,000 t of CO₂ a year. For a renewable-energy investor, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits İzmir’s grid and climate. It is one more example of how our team turns a wind farm grid integration brief into dependable power — and a reference we can build on across Turkey.

FAQ

What was the key challenge in this İzmir installation?

Highly variable wind output and a coastal location demanded step-up transformers with excellent thermal cycling and corrosion resistance. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

SZ13 step-up transformers with OLTC, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.

Explore more

Have a Similar Project?

Contact our team to discuss your project requirements.

Contact Us