Chile Mining Solar-Plus-Storage Project — Project Case

Fengguang Transformer delivered a tailored power package — five 15 MVA step-up units and storage coupling — for a 70 MW mining solar-plus-storage project in Antofagasta, Chile. Explore how our engineering team solved real-world challenges in mining solar-plus-storage project.

Power quality at a 70 MW mining solar-plus-storage project in Antofagasta came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with five 15 MVA step-up units and storage coupling — selected and engineered for this specific mining solar-plus-storage project.

The Site

On site, the facility connects to an isolated desert mining grid, and the local extreme Atacama desert heat and intense UV is a constant factor in equipment design. Chile’s Latin America industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a large copper mining company covered five 15 MVA step-up units and storage coupling, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

An off-grid desert mine needed to replace diesel with solar and storage, requiring transformers that could withstand extreme heat, dust and remote operation. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Operate in extreme desert heat and UV.
  • Integrate solar with battery storage.
  • High reliability with remote monitoring.
  • Minimal water for cooling.

Our Solution

The specification centered on ZGS combined substations and SZ13 step-up transformers. Three decisions shaped the final design:

Electrical performance. Inverter-compatible design and bidirectional storage interface — a direct response to the loads measured on site.

Site resilience. The units were built with UV-resistant coatings and dry-type cooling where water is scarce, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 22 months without a fault, 99.9% supply availability, about 160 GWh delivered annually and cut 95,000 t of CO₂ a year. For a large copper mining company, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Antofagasta’s grid and climate. It is one more example of how our team turns a mining solar-plus-storage project brief into dependable power — and a reference we can build on across Chile.

FAQ

What was the key challenge in this Antofagasta installation?

An off-grid desert mine needed to replace diesel with solar and storage, requiring transformers that could withstand extreme heat, dust and remote operation. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

ZGS combined substations and SZ13 step-up transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.