Bangladesh Textile Industrial Zone — Project Case

Fengguang Transformer delivered a tailored power package — ten 1,250 kVA and six 800 kVA units — for a 20 MW textile industrial zone in Dhaka, Bangladesh. Explore how our engineering team solved real-world challenges in textile industrial zone.

Power quality at a 20 MW textile industrial zone in Dhaka came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with ten 1,250 kVA and six 800 kVA units — selected and engineered for this specific textile industrial zone.

The Site

On site, the facility connects to an industrial network with frequent load shedding, and the local hot, humid monsoon climate is a constant factor in equipment design. Bangladesh’s South Asia industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a textile manufacturers’ association covered ten 1,250 kVA and six 800 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Frequent load shedding and voltage instability disrupted production, and many small units needed a standardized, easy-to-maintain solution. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Withstand frequent outages and restarts.
  • Standardized units for easy spare parts.
  • Low losses for cost-sensitive operators.
  • Humidity tolerance.

Our Solution

The specification centered on S11 and S13 oil-immersed distribution transformers. Three decisions shaped the final design:

Electrical performance. Rugged, standardized design with good overload margin — a direct response to the loads measured on site.

Site resilience. The units were built with sealed tanks suited to humid conditions, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 18 months without a fault, 99.7% supply availability, about 40 million kWh delivered annually and cut 23,000 t of CO₂ a year. For a textile manufacturers’ association, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Dhaka’s grid and climate. It is one more example of how our team turns a textile industrial zone brief into dependable power — and a reference we can build on across Bangladesh.

FAQ

What was the key challenge in this Dhaka installation?

Frequent load shedding and voltage instability disrupted production, and many small units needed a standardized, easy-to-maintain solution. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S11 and S13 oil-immersed distribution transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.