Indonesia Port And Marine Engineering Complex — Project Case

Fengguang Transformer delivered a tailored power package — five 2,500 kVA and four 1,000 kVA units — for a 28 MW port and marine engineering complex in Surabaya, Indonesia. Explore how our engineering team solved real-world challenges in port and marine engineering complex.

Power quality at a 28 MW port and marine engineering complex in Surabaya came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with five 2,500 kVA and four 1,000 kVA units — selected and engineered for this specific port and marine engineering complex.

The Site

On site, the facility connects to an coastal grid exposed to salt-laden air and frequent switching, and the local hot, salty marine atmosphere with strong corrosion risk is a constant factor in equipment design. Indonesia’s Southeast Asia industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a state-owned port authority covered five 2,500 kVA and four 1,000 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Salt spray corroded outdoor equipment quickly, and crane and cold-storage loads created large, unpredictable demand swings. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Resist salt-spray corrosion on all outdoor surfaces.
  • Cope with large motor-start currents from cranes.
  • Stable supply to refrigerated container yards.
  • Easy spare-parts replacement.

Our Solution

The specification centered on S13 oil-immersed transformers with anti-corrosion treatment. Three decisions shaped the final design:

Electrical performance. A high short-circuit strength design to absorb crane motor starts — a direct response to the loads measured on site.

Site resilience. The units were built with marine-grade paint, stainless fittings and a sealed conservator, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 20 months without a fault, 99.8% supply availability, about 49 million kWh delivered annually and cut 29,000 t of CO₂ a year. For a state-owned port authority, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Surabaya’s grid and climate. It is one more example of how our team turns a port and marine engineering complex brief into dependable power — and a reference we can build on across Indonesia.

FAQ

What was the key challenge in this Surabaya installation?

Salt spray corroded outdoor equipment quickly, and crane and cold-storage loads created large, unpredictable demand swings. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S13 oil-immersed transformers with anti-corrosion treatment, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.

Explore more

Have a Similar Project?

Contact our team to discuss your project requirements.

Contact Us