Skip to main content
Industrial, Mining & Oil-Gas · 2026-11-23

Thailand Automotive Industrial Estate — Project Case

Fengguang Transformer delivered a tailored power package — eight 2,000 kVA and three 3,150 kVA units — for a 32 MW automotive industrial estate in Rayong, Thailand. Explore how our engineering team solved real-world challenges in automotive industrial estate.

Power quality at a 32 MW automotive industrial estate in Rayong came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with eight 2,000 kVA and three 3,150 kVA units — selected and engineered for this specific automotive industrial estate.

The Site

On site, the facility connects to the Eastern Economic Corridor grid, subject to seasonal load swings, and the local tropical heat with ambient temperatures regularly above 40 °C is a constant factor in equipment design. Thailand’s Southeast Asia industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for an international vehicle assembly group covered eight 2,000 kVA and three 3,150 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Peak loads from welding and painting shops strained the estate’s distribution, and high ambient heat reduced transformer overload margin. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Handle sharp, repetitive load peaks from welding.
  • Operate reliably at 40 °C+ ambient.
  • Meet Thailand’s tight energy-efficiency standards.
  • Minimal on-site maintenance.

Our Solution

The specification centered on S20 Grade-1 energy-efficiency oil-immersed transformers. Three decisions shaped the final design:

Electrical performance. Low-loss cores and an optimized winding design to cut load losses — a direct response to the loads measured on site.

Site resilience. The units were built with enhanced cooling radiators and high-temperature insulating oil, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 22 months without a fault, 99.95% supply availability, about 58 million kWh delivered annually and cut 34,000 t of CO₂ a year. For an international vehicle assembly group, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Rayong’s grid and climate. It is one more example of how our team turns a automotive industrial estate brief into dependable power — and a reference we can build on across Thailand.

FAQ

What was the key challenge in this Rayong installation?

Peak loads from welding and painting shops strained the estate’s distribution, and high ambient heat reduced transformer overload margin. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S20 Grade-1 energy-efficiency oil-immersed transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.

Explore more

Have a Similar Project?

Contact our team to discuss your project requirements.

Contact Us