Vietnam Electronics Manufacturing Park — Project Case

Fengguang Transformer delivered a tailored power package — four 2,500 kVA and six 1,600 kVA units — for a 24 MW electronics manufacturing park in Ho Chi Minh City, Vietnam. Explore how our engineering team solved real-world challenges in electronics manufacturing park.

Power quality at a 24 MW electronics manufacturing park in Ho Chi Minh City came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with four 2,500 kVA and six 1,600 kVA units — selected and engineered for this specific electronics manufacturing park.

The Site

On site, the facility connects to Ho Chi Minh City’s fast-growing industrial grid, where voltage sags during the dry season, and the local hot, humid tropical climate with monsoon humidity above 85% is a constant factor in equipment design. Vietnam’s Southeast Asia industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a leading consumer-electronics OEM covered four 2,500 kVA and six 1,600 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Voltage dips from the crowded local grid were tripping sensitive SMT lines, while humidity threatened insulation life. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Ride through frequent voltage sags without tripping.
  • Maintain stable voltage for precision assembly equipment.
  • Withstand high humidity without insulation degradation.
  • Low noise near worker areas.

Our Solution

The specification centered on S13-M series sealed oil-immersed transformers and ZGS combined substations. Three decisions shaped the final design:

Electrical performance. A higher short-circuit withstand design and vacuum oltc on the main units — a direct response to the loads measured on site.

Site resilience. The units were built with moisture-resistant epoxy coatings and a fully sealed tank with silica-gel breathers, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 18 months without a fault, 99.9% supply availability, about 42 million kWh delivered annually and cut 25,000 t of CO₂ a year. For a leading consumer-electronics OEM, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Ho Chi Minh City’s grid and climate. It is one more example of how our team turns a electronics manufacturing park brief into dependable power — and a reference we can build on across Vietnam.

FAQ

What was the key challenge in this Ho Chi Minh City installation?

Voltage dips from the crowded local grid were tripping sensitive SMT lines, while humidity threatened insulation life. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S13-M series sealed oil-immersed transformers and ZGS combined substations, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.