South Africa Deep-Level Mining Power Supply — Project Case

Fengguang Transformer delivered a tailored power package — six 3,150 kVA and four 2,500 kVA units — for a 38 MW deep-level mining power scheme in Johannesburg, South Africa. Explore how our engineering team solved real-world challenges in deep-level mining power.

Power quality at a 38 MW deep-level mining power scheme in Johannesburg came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with six 3,150 kVA and four 2,500 kVA units — selected and engineered for this specific deep-level mining power.

The Site

On site, the facility connects to a high-voltage industrial network with heavy cyclic loads, and the local high-altitude, dry climate with large daily temperature swings is a constant factor in equipment design. South Africa’s Africa industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a large mining group covered six 3,150 kVA and four 2,500 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Deep-shaft hoists and ventilation created extreme cyclic loads, and any power failure underground posed serious safety risks. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Survive severe load cycling and voltage dips.
  • Highest reliability for underground safety.
  • Operate at high altitude.
  • Easy maintenance with local skills.

Our Solution

The specification centered on S13 oil-immersed power transformers with OLTC. Three decisions shaped the final design:

Electrical performance. Reinforced windings and high short-circuit withstand — a direct response to the loads measured on site.

Site resilience. The units were built with altitude-corrected cooling and robust tap changers, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 25 months without a fault, 99.96% supply availability, about 95 million kWh delivered annually and cut 55,000 t of CO₂ a year. For a large mining group, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Johannesburg’s grid and climate. It is one more example of how our team turns a deep-level mining power brief into dependable power — and a reference we can build on across South Africa.

FAQ

What was the key challenge in this Johannesburg installation?

Deep-shaft hoists and ventilation created extreme cyclic loads, and any power failure underground posed serious safety risks. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

S13 oil-immersed power transformers with OLTC, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.

Explore more

Have a Similar Project?

Contact our team to discuss your project requirements.

Contact Us