Fengguang Transformer delivered a tailored power package — five 3,150 kVA and three 2,000 kVA units — for a 30 MW seawater desalination plant in Muscat, Oman. Explore how our engineering team solved real-world challenges in desalination plant power.
On site, the facility connects to a coastal industrial grid with high-power motor loads, and the local hot, saline coastal atmosphere is a constant factor in equipment design. Oman’s Middle East industrial growth has raised expectations for both capacity and continuity of supply.
Fengguang’s scope for a national water utility covered five 3,150 kVA and three 2,000 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.
High-power pumps and reverse-osmosis trains demanded robust transformation in a corrosive coastal setting, with no tolerance for unplanned downtime. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.
The specification centered on S13 oil-immersed transformers with marine protection. Three decisions shaped the final design:
Electrical performance. High short-circuit strength for pump motor starting — a direct response to the loads measured on site.
Site resilience. The units were built with marine-grade coatings and stainless steel hardware, so performance holds up despite the local environment.
Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.
More than a year on, the numbers speak clearly: 23 months without a fault, 99.94% supply availability, about 72 million kWh delivered annually and cut 40,000 t of CO₂ a year. For a national water utility, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.
Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Muscat’s grid and climate. It is one more example of how our team turns a desalination plant power brief into dependable power — and a reference we can build on across Oman.
High-power pumps and reverse-osmosis trains demanded robust transformation in a corrosive coastal setting, with no tolerance for unplanned downtime. We addressed it through targeted design choices rather than a standard catalog unit.
S13 oil-immersed transformers with marine protection, tailored to the site’s load profile and environment.
Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.