Skip to main content
Grid & Distribution Projects · 2026-11-20

Tanzania Railway Electrification — Project Case

Fengguang Transformer delivered a tailored power package — five 2,500 kVA and six 1,000 kVA units — for a 22 MW railway electrification supply scheme in Dar es Salaam, Tanzania. Explore how our engineering team solved real-world challenges in railway electrification.

Power quality at a 22 MW railway electrification supply scheme in Dar es Salaam came down to one question: could the distribution equipment hold up under real site conditions? Fengguang Transformer answered with five 2,500 kVA and six 1,000 kVA units — selected and engineered for this specific railway electrification.

The Site

On site, the facility connects to a developing traction supply network along the corridor, and the local hot, humid coastal climate is a constant factor in equipment design. Tanzania’s Africa industrial growth has raised expectations for both capacity and continuity of supply.

Scope of Supply

Fengguang’s scope for a national railway operator covered five 2,500 kVA and six 1,000 kVA units, from selection and custom design through factory testing, shipment and installation supervision. Every unit was checked against the client’s actual load data before it left the factory.

The Engineering Challenge

Traction loads are highly variable and regenerative, and the remote route demanded transformers that could handle frequent load reversals with minimal upkeep. That was the practical problem our engineers had to solve — the kind of issue that a generic datasheet never reveals and that only shows up once a plant is running at full load.

Client Requirements

  • Handle regenerative traction loads.
  • Stable voltage along a long route.
  • Low maintenance at remote sites.
  • Resilient in humid coastal weather.

Our Solution

The specification centered on ZGS combined substations and S13 oil-immersed transformers. Three decisions shaped the final design:

Electrical performance. Bidirectional-capable design and robust tap control — a direct response to the loads measured on site.

Site resilience. The units were built with weatherproof enclosures and corrosion protection, so performance holds up despite the local environment.

Service and partnership. Detailed documentation, remote technical support and operator training were included, with spare parts kept readily available.

Results in Service

More than a year on, the numbers speak clearly: 19 months without a fault, 99.85% supply availability, about 44 million kWh delivered annually and cut 26,000 t of CO₂ a year. For a national railway operator, that translated into steadier production and lower operating cost — the outcome the project was commissioned to achieve.

Key Takeaways

Every site is different, and this one demanded more than an off-the-shelf unit. By starting from the load study and working outward, Fengguang delivered a transformer package that fits Dar es Salaam’s grid and climate. It is one more example of how our team turns a railway electrification brief into dependable power — and a reference we can build on across Tanzania.

FAQ

What was the key challenge in this Dar es Salaam installation?

Traction loads are highly variable and regenerative, and the remote route demanded transformers that could handle frequent load reversals with minimal upkeep. We addressed it through targeted design choices rather than a standard catalog unit.

Which transformer series did Fengguang choose?

ZGS combined substations and S13 oil-immersed transformers, tailored to the site’s load profile and environment.

How quickly can Fengguang support a comparable project?

Our engineers work from your load data and site conditions. Contact our team and we will outline a proposed design and schedule.

Explore more

Have a Similar Project?

Contact our team to discuss your project requirements.

Contact Us